| Building |
Project |
Timeline |
Status |
| Administrative Annex |
Replace flooring. |
Fall 2008 |
Complete |
Babler Elementary
Back to top |
Provide addition for new entrance, lobby, principals' offices and conference room. |
Late Fall 2009 |
Complete |
| Provide new curb and sidewalk. |
Late Fall 2009 |
Complete |
| Provide ADA door operator. |
Late Fall 2009 |
Complete |
|
|
|
| Renovate existing nurse and office area. |
Late Fall 2009 |
Complete |
| Install elevator and ramp for ADA access. |
Late Fall 2009 |
Complete |
| Add a restroom. |
Late Fall 2009 |
Complete |
| Convert three classrooms to two large classrooms. |
Late Fall 2009 |
Complete |
| Renovate serving lines |
Late Fall 2009 |
Complete |
| Install parking lot lights. |
Late Fall 2009 |
Complete |
| Replace public address system. |
Fall 2009 |
Complete |
| Renovate one pair of restrooms. |
Fall 2009 |
Complete |
| Upgrade HVAC. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
| Replace flooring. |
Fall 2008 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Spring 2009 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Ballwin Elementary
Back to top |
Replace sections of roofing. |
Fall 2010 |
Complete |
| Replace ceiling insulation in gym. |
Fall 2009 |
Complete |
| Replace fire alarm system. |
Fall 2008 |
Complete |
| Renovate two pair of restrooms. |
Fall 2008 |
Complete |
| Upgrade HVAC. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Blevins Elementary
Back to top |
Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Bowles Elementary
Back to top |
Add storage and PE office. |
Fall 2010 |
Complete |
| Replace ceiling insulation in gym. |
Fall 2009 |
Complete |
| Renovate seven pair of student restrooms. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2008 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Bus garage
Back to top |
Replace bus garage building roof. |
Fall 2010 |
Complete |
CCL
Back to top |
Replace public address system. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2008 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
Chesterfield Elementary
Back to top |
Update space for nurse. |
Fall 2010 |
Complete |
|
|
|
| Replace sections of roofing. |
Fall 2009 |
Complete |
| Expand rear parking lot. |
Fall 2008 |
Complete |
| Replace ceiling insulation in gym. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Crestview Middle
Back to top |
|
|
|
| Resurface Clayton Rd. parking lot. |
Fall 2010 |
Complete |
| Replace sections of roofing. |
Fall 2010 |
Complete |
| Replace fire alarm system. |
Fall 2009 |
Complete |
| Upgrade HVAC. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
Install intruder alert system.
Replace aged business lab computers |
Fall 2009
Summer 2008 |
Complete |
| Replace aged classroom and business lab computers, and install additional classroom computers to lower the student to computer ratio |
Summer 2008 - Summer 2010 |
Complete |
| Replace aged laptops for RITTS teachers |
Summer 2008 - Summer 2010 |
Complete |
| Replace aged projection devices |
Summer 2008 - Summer 2010 |
Complete |
Early Childhood-Clarkson Valley
Back to top |
Install intruder alert system. |
Fall 2009 |
Complete |
Early Childhood-Vandover
Back to top |
Renovate and expand student health services/nurse's office. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
Ellisville Elementary
Back to top |
Replace section of roof. |
Fall 2009 |
Complete |
| Provide automatic fire sprinkler system expansion. |
Fall 2010
|
Complete
|
| Provide drop-off and pick-up lane across rear of school. |
Fall 2009 |
Complete |
| Renovate one pair of restrooms. |
Fall 2008 |
Complete |
| Upgrade HVAC. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace flooring. (phase 1) |
Fall 2008 |
Complete |
| Replace flooring. (phase 2) |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Eureka Elementary
Back to top |
Update space for nurse. |
Fall 2010 |
Complete |
| Replace sections of roofing; install new guttering. |
Fall 2009 |
Complete |
| Replace public address system. |
Fall 2008 |
Complete |
| Replace ceiling insulation in gym. |
Fall 2009 |
Complete |
| Renovate one pair of restrooms. |
Fall 2008 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
| Upgrade HVAC. |
Fall 2008 |
Complete |
| Replace flooring. |
Fall 2008 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
Eureka High
Back to top |
Replace sections of roofing. |
Fall 2010 |
Complete |
| Add fourteen classrooms. |
Fall 2009 |
Complete |
| Provide two-story addition for five classrooms, student assistance/teacher work space and band room; renovate music wing, replacing all trailers. |
Fall 2010 |
Complete |
| Replace aged phone/voicemail system. |
Summer 2008 - Summer 2009 |
Complete |
| Replace aged computer science lab computers. |
Summer 2008 |
Complete |
| Provide wireless laptop carts for student areas (in support of the new high school schedule). |
Summer 2008 |
Complete |
| Replace aged laptop carts for students. |
Summer 2008 - Summer 2009 |
Complete |
| Install projection devices and replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Renovate interior spaces to provide flex space, upgrades to art and FACS rooms, and a language arts lab; Provide renovation for a new library. |
Fall 2010 |
Complete |
| Renovate one pair of restrooms. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2008 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
Fairway Elementary
Back to top |
Provide two additional classrooms.
Kindergarten Room |
Fall 2010
Late Fall 2009 |
Complete
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Geggie Elementary
Back to top |
Provide automatic fire sprinkler system expansion. |
Fall 2009 |
Complete |
| Update space for nurse. |
Fall 2008 |
Complete |
| Add new ceilings and exterior windows in 12 rooms. |
Fall 2009 |
Complete |
Renovate kindergarten restroom into a pair of restrooms with dual access from the two other kindergarten classrooms.
|
Fall 2009
|
Complete
|
| Renovate one kindergarten room. |
Late Fall 2009 |
Complete |
| Provide an extension off of kindergarten area for Adventure Club addition and Vocal Room addition. |
Late Fall 2009 |
Complete |
| Provide an internal roof hatch for access to the roof. |
Fall 2009 |
Complete |
| Replace public address system. |
Fall 2008 |
Complete |
| Upgrade HVAC. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Green Pines Elementary
Back to top |
Provide automatic fire sprinkler system expansion. |
Fall 2010 |
Complete |
| Replace public address system. |
Fall 2009 |
Complete |
| Renovate lower hall student restrooms. |
Fall 2009 |
Complete |
| Upgrade HVAC. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Individualized Learning Center
Back to top |
Replace aged classroom computers. |
Summer 2008 - Summer 2009 |
Complete |
Kehrs Mill Elementary
Back to top |
Add three kindergarten classrooms. |
Fall 2010 |
Complete |
| Renovate room 1 for nurse area, teacher workroom and teacher lounge. |
Fall 2010 |
Complete |
| Replace front entrance doors. |
Fall 2010 |
Completet |
| Replace section of roofing. |
Fall 2010 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board) |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms |
Summer 2008 - Spring 2009 |
Complete |
| Replace public address system. |
Fall 2009 |
Complete |
| Upgrade HVAC. |
Fall 2008 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
Kellison Elementary
Back to top |
Renovate one pair of restrooms. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Lafayette High
Back to top |
Provide new library. |
Late fall 2009 |
Complete |
| Renovate existing library for student assistance/teacher work space and flex space. |
Late fall 2009 |
Complete |
| Add eight new classrooms to replace all trailers. |
Late fall 2009 |
Complete |
| Provide two-story addition for varsity locker rooms and multi-purpose room. |
Fall 2010 |
Complete |
| Renovate existing varsity locker rooms, replacing lockers in all locker rooms. |
Fall 2010 |
Complete |
| Add elevator access to lower level. |
Fall 2010 |
Complete |
| Renovate pool area. |
Fall 2009 |
Complete
|
| Upgrade HVAC. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged phone/voicemail system. |
Summer 2008 - Summer 2009 |
Complete |
| Replace aged computer science lab computers. |
Summer 2008 |
Complete |
| Provide wireless laptop carts for student areas (in support of the new high school schedule). |
Summer 2008 |
Complete |
| Replace aged laptop carts for students. |
Summer 2008 - Summer 2009 |
Complete |
| Install projection devices and replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
LaSalle Springs Middle
Back to top |
Pave additional parking to provide better drop-off / pick-up system. |
Fall 2010
|
Complete
|
| Replace sections of roofing. |
Fall 2008 |
Complete |
| Add electrical capacity. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system.
Replace aged business lab
|
Fall 2009
Summer 2008 |
Complete
Complete
|
| Replace aged business lab computers
Replace aged classroom and install additional classroom computers to lower the student to computer ratio. |
Summer 2008 - Summer 2010 |
Complete
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
Marquette High
Back to top |
Provide seven classroom additions and student assistance/teacher work space. |
Fall 2009 |
Complete |
| Pave the fire access road and connecting walks to all adjacent fire exit doors. |
Late Fall 2010 |
Complete |
| Provide two-story addition for orchestra room; reconfigure choral room and add storage and practice rooms; provide loading access to rear of stage; add additional space for flex and school storage. |
Late Fall 2010 |
Complete |
| Install magnetic hold-backs on 10-12 sets of doors. |
Fall 2008
|
Complete |
| Replace the fire alarm system. |
Fall 2008 |
Complete |
| Replace sections of roofing. |
Fall 2008 |
Complete |
| Replace flooring. |
Fall 2008 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
| Replace aged phone/voicemail system. |
Summer 2008 - Summer 2009 |
Complete |
| Replace aged computer science lab computers. |
Summer 2008 |
Complete |
| Provide wireless laptop carts for student areas (in support of the new high school schedule). |
Summer 2008 |
Complete |
| Replace aged laptop carts for students. |
Summer 2008 - Summer 2009 |
Complete |
| Install projection devices and replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
Pond Elementary
Back to top |
Update space for nurse. |
Late Fall 2010 |
Complete |
| Convert custodial closet to a faculty restroom. |
Fall 2010 |
Complete |
| Expand and renovate the art room. |
Late Fall 2010 |
Complete |
| Renovate central core of building. |
Fall 2010 |
Complete |
| Replace main entrance doors, frames and window glass with ADA electric door. |
Late Fall 2010 |
Complete |
| Expand parking and add drop-off/pick-up lane. |
Fall 2009 |
Complete |
|
|
|
| Remove abandoned underground storage tank beneath front parking lot. |
Fall 2009 |
Complete |
| Resurface entire front bus lane and parking lot; improve storm drains. |
Fall 2009 |
Complete |
| Provide second vehicle entrance to bus parking. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Renovate sections of roofing. |
Fall 2010 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Ridge Meadows Elementary
Back to top |
Overlay and restripe parking lots and drives. |
Fall 2010 |
Complete |
Replace sections of roofing. |
Fall 2009 |
Complete |
| Replace public address system. |
Fall 2008 |
Complete |
| Upgrade HVAC. |
Fall 2008 |
Complete |
| Renovate one pair of restrooms. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2008 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Rockwood South Middle
Back to top |
Replace sections of roofing. |
Fall 2008 |
Complete |
| Replace the public address system. |
Fall 2009 |
Complete |
| Replace the fire alarm system. |
Fall 2009 |
Complete |
| Renovate one pair of restrooms. |
Fall 2009 |
Complete |
| Upgrade HVAC. |
Fall 2008 |
Complete |
| Replace flooring. (Phase 1) |
Fall 2008 |
Complete |
| Replace flooring. (Phase 2) |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged business lab computers
Replaced aged classroom computers and install additional classroom computers to lower the student to computer ratio. |
Summer 2008 - Summer 2010 |
Complete
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
Rockwood Summit High
Back to top |
Provide space for new library. |
Winter 2010 |
Complete |
| Add four classrooms, replacing trailers. |
Winter 2010 |
Complete |
| Add locker rooms and weight room. |
Fall 2010 |
Complete |
| Renovate existing library. |
Spring 2010 |
Complete |
| Expand and renovate band room. |
Fall 2010 |
Complete |
| Reconfigure soccer practice field and football practice field to be a regulation-sized football fields. |
Fall 2008 |
Complete |
| Convert south side practice field to be a field hockey / lacrosse field. |
Fall 2008
|
Complete |
| Irrigate newly reconfigured fields. |
Fall 2008 |
Complete |
| Renovate one pair of restrooms. |
Fall 2008 |
Complete |
| Replace flooring. |
Fall 2008 |
Complete |
| Upgrade HVAC. (Phase 1) |
Fall 2008 |
Complete |
| Upgrade HVAC. (Phase 2) |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged phone/voicemail system. |
Summer 2008 - Summer 2009 |
Complete |
| Replace aged Computer Science lab computers. |
Summer 2008 |
Complete |
| Provide wireless laptop carts for student areas (in support of the new High School schedule). |
Summer 2008 |
Complete |
| Replace aged laptop carts for students. |
Summer 2008 - Summer 2009 |
Complete |
| Install projection devices and replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
Rockwood Valley Middle
Back to top |
Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replaced age business lab computers
Replace aged classroom computers, and install additional classroom computers to lower the student to computer ratio. |
Summer 2008 - Summer 2010 |
Complete
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
Selvidge Middle
Back to top |
Expand and renovate library and computer lab. |
Late Fall 2010 |
Complete |
| Renovate one pair of restrooms. |
Fall 2009 |
Complete |
| Upgrade HVAC. |
Fall 2008 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged business lab computers
Replace aged classroom computers and install additional classroom computers to lower the student to computer ratio. |
Summer 2008 - Summer 2010 |
Complete
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
Stanton Elementary
Back to top |
Provide four classrooms and renovate existing room. |
Fall 2009 |
Complete |
| Replace ceiling insulation system in cafeteria. |
Fall 2009 |
Complete |
| Renovate one pair of restrooms. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2008 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Uthoff Valley Elementary
Back to top |
Renovate one pair of restrooms. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Warehouse
Back to top |
Replace the fire alarm system. |
Fall 2008 |
Complete |
Westridge Elementary
Back to top |
Add four classrooms and room for Adventure Club, SSD; renovate classroom for PE office and additional student restrooms. |
Fall 2009 |
Complete |
| Update HVAC. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Wild Horse Elementary
Back to top |
Provide four classrooms. |
Fall 2009 |
Complete |
| Replace flooring. |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
Wildwood Middle
Back to top |
Install intruder alert system. |
Fall 2009 |
Complete |
| Replace aged business lab computers
Replace aged classroom and install additional classroom computers to lower the student to computer ratio. |
Summer 2008 - Summer 2010 |
Complete
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
Woerther Elementary
Back to top |
Replace section of roof; fix roof drains to allow proper drainage. |
Fall 2009 |
Complete |
| Replace ceiling insulation system in gym. |
Fall 2009 |
Complete |
| Renovate one pair of restrooms. |
Fall 2008 |
Complete |
| Upgrade HVAC. |
Fall 2009 |
Complete |
| Replace flooring. (Phase 1) |
Fall 2008 |
Complete |
| Replace flooring. (Phase 2) |
Fall 2009 |
Complete |
| Install intruder alert system. |
Fall 2008 |
Complete |
| Replace aged classroom computers and install additional classroom computers to lower the student-to-computer ratio. |
Fall 2008 - Fall 2009 |
Complete |
| Replace aged laptops for RITTS teachers. |
Summer 2008 - Summer 2010 |
Complete |
| Install interactive whiteboards/ projectors (SMART Board). |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged projection devices. |
Summer 2008 - Summer 2010 |
Complete |
| Install amplification systems in kindergarten, 4th and 5th grade classrooms. |
Summer 2008 - Spring 2009 |
Complete |
District wide
Back to top |
|
|
|
| Implement centralized telephone/voicemail core system. |
Summer 2008 - Spring 2009 |
Complete |
| Replace aged Child Nutrition Services system. |
Summer 2008- Spring 2009 |
Complete |
| Replace aged library system. |
Summer 2008 - Spring 2009 |
Complete |
| Implement textbook inventory system. |
Summer 2009 - Spring 2010 |
Complete |
| Replace aged Finance/HR system. |
Summer 2008 -Fall 2010 |
Complete |
| Replace aged network security and monitoring equipment. |
Fall 2009 |
Complete |
| Replace aged network access equipment (routers/switches). |
Summer 2008 - Summer 2010 |
Complete |
| Replace aged instructional servers and storage equipment. |
Summer 2008 - Summer 2010 |
Complete |
| Install wireless controller and access points to expand existing wireless school building coverage. |
Summer 2008 - Spring 2009 |
Complete |